Probable Niche

We've identified the niche as international symposium.

international symposium

Informational note Qirina attempts to ascertain what sites are about based on an analysis of the text content on the front page. Did we get this one right? What do you think? If the niche has been incorrectly identified,'s performance can probably be substantially improved by on-site SEO. Help

Niche Keys

Here are some keywords which we've determined lie within the same circle of relevance as international symposium.

symposium, international, ieee, registration, ieee international, conference, welcome, university, program, information, info, home, engineering, electromagnetic compatibility, tutorials, tsinghua university, submissions, submission deadline, submission, steering committee's neighbors

Qirina has identified a number of sites similar to Here they are:

Analysis Summary

The site's front page was last accessed by Qirina at 02:06 UTC on April 14, 2013. The source was comprised of 9891 characters, of which 8706 are code, leaving an organic character count of 1185. The total word count on the home page is 196. We filtered out 21 numbers, 61 common words, and 10 words shorter than three characters in length, leaving an impact word count of 101. The size of the lexicon (number of unique words) is only 73. We extracted fifteen top keywords, leaving 20.54% above the threshold. The number of phrases above the threshold was 26.

Top Keywords

KeywordFrequencyFrequency %
neurorepair 21.98%
neuroprotection 21.98%

Top Phrases

KeywordFrequencyFrequency %
stroke symposium 26.89%
stems project 26.89%
international symposium26.89%
thematic area13.44%
targeted research13.44%
symposium organised13.44%
stroke conference13.44%
stems coordinator 13.44%
stems consortium 13.44%
stem cell13.44%
specific targeted13.44%
research project13.44%
project website13.44%
number lhsb 13.44%
neurological societies13.44%
life sciences13.44%
klaus reymann 13.44%
fp6 programme 13.44%
european stroke 13.44%
european federation13.44%
european commission13.44%
coordinator brigitte 13.44%
commission within13.44%
clinical trials13.44%
cell therapy13.44%
brigitte onteniente 13.44%

Domain Name Keywords

We found 3 significant keywords appearing in the domain name
  1. stems
  2. project
  3. stems project


Source Character Count 9891
Code Character Count 8706
Organic Character Count 1185
Filtered Numbers 21
Filtered Words (Common) 61
Filtered Words (Short) 10
Total Word Count 196
Impact Paragraph Count 239
Impact Word Count 101
Impact Lexicon Size 73


# a b c d e f g h i j k l m n o p q r s t u v w x y z


# a b c d e f g h i j k l m n o p q r s t u v w x y z